Records for authorities and inspectors
An inspection shows the condition of a site at the time of the visit. Contractors using decoNXT can document the entire course of the work with time-stamped records of negative pressure, alarms and configuration changes, as a PDF report or through read-only access.

Typical challenges
- Snapshot
- An inspection shows the containment area on the day of the visit, not during the nights and weekends before.
- Verifiability
- With handwritten logs and individual printouts it is difficult to judge whether a record is complete.
- Implementation of the notification
- The notification describes the planned measures. It does not show whether they were maintained during the work.
Information provided
- Time-stamped records
- Every reading is stored in parallel on a thermal printer, an SD card and in the cloud, where it remains available for up to 10 years.
- Logged alarms
- Pressure deviations, power failures and tamper or movement alarms are recorded with their time, as are the start and stop of devices.
- Configuration changes
- Reports show when limit values or settings were changed.
- Reports on request
- Contractors can create a PDF report for any period and send it to the authority by email.
Frequently asked questions
Can an authority access the data directly?
Only if invited by the contractor. Access is granted per device, and the user role provides read-only access.
What does a report contain?
Device and site information, the readings for the selected period, device messages and alarms, and the history of configuration changes.
Which regulations does decoNXT help document?
The EU Asbestos Directive and national rules such as TRGS 519 or EKAS guideline 6503 require protective measures for work under confinement to be implemented and documented. decoNXT records the negative pressure in the containment area. The assessment remains the responsibility of the contractor, the consultant and the authority.